Most bad land purchases fail on something that was visible from a desk: no legal access, a creek bottom that floods, soil that will not take a septic system, a zoning rule that forbids the plan. This is the check in the order that kills the most deals fastest, so you stop early on the wrong parcel and spend the site visit and the professionals on the right one.
| 1. Boundaries and acreage | Find the parcel on the county's own GIS lines and read the deeded or GIS acreage. Listings round up; a 10.2-acre listing that maps at 8.6 acres is a price conversation, not a surprise at closing. |
|---|---|
| 2. Legal access | A road that touches the parcel on the map is not a right to use it. Look for public road frontage, a recorded easement or a private road agreement. No access means no building permit and no mortgage. |
| 3. Flood | Read the FEMA zone across the parcel, not just at the pin. A dry upland building site with a wet creek bottom can be fine; a parcel that is all A or AE zone is a different purchase. |
| 4. Wetlands | Mapped wetlands and open water are the land you cannot fill, drain or build on without a permit you may not get. They also hint at a high water table around them. |
| 5. Soils and septic | Off the sewer line, the soil decides whether you can live there. Read the survey's septic rating and drainage class before you pay for a perc test. |
| 6. Slope and the house site | Find the part of the lot flat enough for the house, the drain field and a driveway. Over about 15% slope, building gets expensive; over about 25%, many counties restrict it. |
| 7. Wildfire | In wooded and dry country, wildfire risk shapes the building code, the insurance and the road in. Look up the area's wildfire risk before you fall for the trees. |
| 8. Zoning | The district sets minimum lot size, setbacks, what you may build and whether you may split the land. Agricultural and conservation districts often forbid the second house or the business. |
| 9. Protected land and easements | Conservation easements, utility corridors and adjoining public land limit what you can do and who can cross you. Pipelines and transmission lines carry their own setbacks. |
| 10. Utilities | Power at the road, or a mile away? Water, sewer, gas and internet each change the budget. Ask the utility, and check broadband at the address on the FCC's map. |
| 11. Owner and tax record | The county record shows the owner of record and assessed value; the treasurer or tax collector shows whether taxes are paid. A long-held parcel in an estate or a trust is a slower, different negotiation. |
| 12. Covenants and HOA | Platted subdivisions carry recorded covenants: minimum house size, no mobile homes, no livestock, architectural review. They bind every later buyer. |
| 13. The deed | Pull the deed from the county recorder. It names the grantor, any reserved rights (minerals, timber, access) and the legal description you will compare with the survey. |
Slope is rise over run: a 15% slope climbs 15 feet in 100. On a sloping lot the question is not the average slope but whether one area is flat enough to hold the house pad, the drain field with its reserve area, and a driveway the county will approve. From about 15%, grading, retaining walls, a longer driveway and a designed septic system start to cost real money; the soil survey generally rates ground steeper than about 15% very limited for a conventional drain field on slope alone. Over about 25%, many counties restrict building or require an engineer's plan. Driveways have limits too: the model fire code that many counties adopt caps a fire-truck access road at a 10% grade unless the fire official approves more, and some counties set their own driveway rules.
Wildfire risk is a building, insurance and access question across much of the country, not only in the West. The USDA Forest Service's Wildfire Risk to Communities maps wildfire likelihood and the risk to homes for every community in the United States. Some states publish their own hazard maps, such as California's fire hazard severity zones. Counties in fire country may require ignition-resistant construction, cleared defensible space around the house, a water supply for firefighting and a road a fire engine can use. Ask an insurance agent early: in high-risk areas, homeowners coverage can be hard to find.
Every "Unknown" on a map ends with a call. Names differ from county to county, but these are the offices and what each one answers.
| Planning and zoning | The district, permitted uses, setbacks, whether the lot is a legal lot of record, and splitting land. |
|---|---|
| Building or permits | Which codes and inspections apply, and the permits for a house, a driveway and a 911 address. |
| Environmental health | Septic permits and site evaluations, past records on the lot, and well permits. |
| Floodplain administrator | The current flood map, elevation certificates and floodplain permits. |
| Recorder, register of deeds or clerk | Deeds, plats, easements, covenants and liens. |
| Assessor or appraisal district | The owner of record, acreage, land-use class and assessed value. |
| Treasurer or tax collector | Taxes paid or owed, and tax sales. |
| Road department | Who maintains the road, driveway and culvert permits. |
| Conservation district, NRCS and FSA | On farmland: farm records, wetland determinations and conservation plans. |
The Who to call card in LandCheck's panel starts the list for the spot you clicked: the county's own website, the state's septic program page, the deed and parcel record links the panel found, and the FCC broadband map.
Open the map and start with a parcel →
What the parcel source shows in each county LandCheck covers: parcel maps by county.
Everything on this map is read live from public government servers at the scale they publish it. It is a screening tool: a survey, a title search, a perc test and the county's own determinations are what you rely on at closing.